Background

Completed Projects

Specification


  • Frame Structure– Earthquake resistance R.C.C.
  • Finishing of Internal Wall In Flat– P.O.P. over cement plaster
  • Common Area Wall– Plastic Paint over P.O.P.
  • Finishing of External Wall– Acrylic water proof paint
  • Window– Two track Sliding Aluminium Window with glass & M.S. Grill
  • Door – Flush Door
  • Door Frame– Sal Wood Frame.
  • Flooring Inside Flat

      A) Drawing Dinning, Bedroom & Balcony etc. – 2’x2’ Vitrified Tiles
      B) Toilet & Kitchen Floor– Anti skid Ceramic Floor Tiles (12”x12”)
      Lobby/Passage and Stair – Green Marble
  • Kitchen

      – Black Granite Cooking platform with stainless steel sink
      – 2’ height Ceramic Tiles Dado over cooking platform

    Window Seal

      – Marble
  • Toilet

      – 7’ height Ceramic Tiles in walls
      – White basin and E.W.C. (Orissa Pan for Common toilet)
      – Jaguar/ Mark or equivalent C.P. sanitary fitting
  • Electrification

      – Concealed electrical wiring with Modular switches
      – Cable TV and telephone point in all bed room and drawing room
      – Aqua Guard point in Kitchen
      – Geiger point in toilets & Kitchen
      – Chimney Point in Kitchen
  • Water Supply Through overhead tank from two deep tube well boring
  • Generator Facility – Sound Proof generator for Common Area, Lift & 500 Watts in each Flat
  • Lift – 8 Nos Powder Coated Lift (2 Nos x 4 Blocks)
  • Intercom – Provision of Intercom with one No. Hand Set to each Flat
  • 65% Open Space
  • Big size Community Hall with Kitchen
  • Garden with children play equipments (Area 15000 sqft approx.)
  • Sports Centre – Under Roof with Pool Table, T.T. Table & Carom Board
  • Multi Gym with Apparatus
  • Swimming Pool
  • Steam Bath
  • Changing Room
  • Meditation Centre Space
  • Jogger’s Track
  • Place for Car Wash

Note : The management reserve the right to add, delete or alter any specification and facilities mentioned hereinabove.

Enquiry

the best offers of the month

View More